IATF 16949 · 8.5.1.5

Maintenance

Every machine's status at a glance, every work order with an owner, and the tool change verified before the lot runs.

Prensa

P-01

Tipo
Mecánica
Capacidad
250 t
Ubicación
Línea 1
Estado del equipo
!Preventivo vencidoSe excedió la frecuencia de mantenimiento preventivo según plan.
Orden abierta

MT-2025-0842Mantenimiento preventivo general

Responsable
Carlos Ramírez
Fecha compromiso
12 sep 2025
⌁
Cambio de herramienta Firma de Calidad pendiente

El cambio se realizó. Falta verificación de Calidad para liberar el próximo lote.

Historial
  1. !Falla detectada3 sep 2025
    Vibración fuera de rango
  2. Orden de mantenimiento4 sep 2025
    MT-2025-0842
  3. Intervención8 sep 2025
    Cambio de componentes
  4. Verificación de CalidadPendiente
    Firma requerida
  5. Liberación del equipoPendiente
    Tras firma de Calidad
Datos de ejemplo.

From the floor to the machine

From breakdown to repair

Maintenance answers for the machine: status at a glance, every work order with an owner, and the tool change checked before the lot runs.

Today

Today the breakdown arrives by text message, the work order on paper, and the PM slips past its date with nobody noticing.

A text message
Depends on who you ask
Paper, and a PM that slipped
Found out halfway through the lot

With SLOV Operations

With the system, every machine shows its status and why, every work order has an owner and a date, and every tool change is verified before start-up.

Breakdown reported from the floor
Status indicator, with the cause
Owner, date and a PM reminder
Tool change verified and signed
01Report
TodayA text message
With SLOV OperationsBreakdown reported from the floor
02Status
TodayDepends on who you ask
With SLOV OperationsStatus indicator, with the cause
03Work order
TodayPaper, and a PM that slipped
With SLOV OperationsOwner, date and a PM reminder
04Start-up
TodayFound out halfway through the lot
With SLOV OperationsTool change verified and signed

Today the breakdown arrives by text message, the work order on paper, and the PM slips past its date with nobody noticing.

With the system, every machine shows its status and why, every work order has an owner and a date, and every tool change is verified before start-up.

What changes if you start with Maintenance

The machine, its work order and its start-up, on one record

Maintenance knows what failed, what it costs and what stands between the machine and start-up, while the line keeps running.

Status

Overdue PM, open breakdown or line stoppage: every machine shows where it stands and why, and everyone who looks sees the same thing.

Cost

Repair time and cost stay attached to every stoppage. Which machine is the most expensive stops being a matter of opinion.

Start-up

The lot does not run until the tool change checklist is complete. Production and maintenance each sign their part, with a time stamp.

Prevention

Complete a PM and the next one goes on the calendar, with a reminder before it is due. Error-proofing devices get their periodic checks, on record.

The history is already there for SLOV AI

Maintenance records breakdowns, work orders and tool changes every day. SLOV AI compares each breakdown with the earlier ones on the same machine and answers from the manual or the equipment plan. It also flags PMs and calibrations coming due. The maintenance manager decides.

See SLOV AI

Which machine is costing you the most?

Start with Maintenance

You may also want to see: Quality · People